Rapid construction

ENVISIONED BY YOU, SIMPLIFIED BY US, DELIVERED FOR TOMORROW

Why Time to Market matters?

Time has become increasingly important in today’s fast-paced world, especially in the construction industry. Traditional construction timelines can no longer keep up with market demands. Quicker construction allows us to accelerate housing supply, but it also means entities can start generating income from their investments earlier and achieve significantly faster returns on investment (ROI).

The integration of modular construction drastically shortens the time it takes to complete a building, getting your project up and running quicker than ever before 

how modular construction achieves speed

Unlike traditional construction, where site preparation and building happen sequentially, modular construction takes a smarter approach.

Modules are built in the factory while site preparation and foundations are completed simultaneously, cutting down the project timeline significantly.

By shifting construction to a controlled factory environment:

  • No weather delays: Workers are shielded from unpredictable conditions.
  • Minimal disruptions: Factory operations ensure consistent productivity.
  • Reduced downtime: A streamlined process avoids common site-based delays.

On-site construction is accelerated due to:

  • Pre-installed MEP systems (Mechanical, Electrical, and Plumbing): Modules arrive with integrated systems.
  • Simplified on-site work: Focus on connecting systems, not building from scratch.

Standardized module designs can be adapted to different projects without requiring a complete redesign, saving weeks in the planning and fabrication stages.

In modular construction, materials are procured in bulk and stored in factory settings, eliminating the inefficiencies of staggered deliveries to a construction site.

Materials are always available as part of a just-in-time supply chain system, reducing delays caused by on-site shortages or late deliveries

sustainability through speed

pexels-kelly-1179532-11733080

By shortening the construction cycle, projects benefit from energy-efficient designs, less material waste, and fewer resources spent during the building process. Factory-based construction allows for better material management, reducing overproduction, over-ordering, and the waste that results from mismatched deliveries or unnecessary surplus.

Traditional construction often involves multiple shipments of materials over a prolonged period. This results in greater fuel consumption and carbon emissions. With modular, material transportation is planned more efficiently. This is because the majority of the work happens in factory settings, fewer trips are required, reducing overall carbon emissions associated with transporting materials.

Source: Modular Building Institute (MBI)

speed in action: projects completed by our modular partner

Student Acomodation
Residences
0
Months to Build
0
Multi Family Apartments
Residences
0
Months to Build
0
Multi Family Apartments
Residences
0
Months to Build
0
Multi Family Apartments
Residences
0
Months to Build
0
Student acommodation
Residences
0
Months to Build
0
Multi Family Apartments
Residences
0
Months to Build
0

DISCOVER HOW WE CAN ACCELERATE YOUR PROJECT

Talk to us